sharetrader
Page 5 of 101 FirstFirst 1234567891555 ... LastLast
Results 41 to 50 of 1321

Hybrid View

  1. #1
    Legend shasta's Avatar
    Join Date
    Sep 2004
    Location
    Wellington
    Posts
    5,914

    Default

    Quote Originally Posted by AMR View Post
    OEL going for a bit of a run today! +5c.
    Nice jump today was enough to hit an old sell order, am still a bit concerned with the markets in general with the DOW & the POO.

    A nice profit none the less, & i shall return when i know all is well with Galoc & the flow rates are known.

    Have other short term targets

    My selling of OEL, does not change my sentiment at all.

    OEL is the real deal, & 2008 will be a great year

  2. #2
    Legend shasta's Avatar
    Join Date
    Sep 2004
    Location
    Wellington
    Posts
    5,914

    Default

    Quote Originally Posted by shasta View Post
    Nice jump today was enough to hit an old sell order, am still a bit concerned with the markets in general with the DOW & the POO.

    A nice profit none the less, & i shall return when i know all is well with Galoc & the flow rates are known.

    Have other short term targets

    My selling of OEL, does not change my sentiment at all.

    OEL is the real deal, & 2008 will be a great year
    Galoc update (via NDO)

    http://www.stocknessmonster.com/news...E=ASX&N=409178

    Gas flow from the 2nd well

    http://www.stocknessmonster.com/news...E=ASX&N=409101
    Last edited by shasta; 04-06-2008 at 04:27 PM.

  3. #3
    Guru
    Join Date
    Jul 2004
    Posts
    2,629

    Lightbulb Peter Strachaun rates as a bargin up to 80 cents!

    And yes oil to flow soon as WELL, then we will see some excitement!


    4 June 2008
    Otto Flows Gas from Second Well - Kuzey Arpaci-1
    Edirne, Western Turkey
    Joint venture partners Otto Energy (ASX: OEL) and Incremental
    Petroleum (ASX: IPM) announce that the Kuzey Arpaci-1 well has
    tested at excellent flow rates from a tested section of only 5m in the
    lower reservoir.
    Highlights
    •
    Kuzey Arpaci-1 flowed dry gas at a rate of 1.15 MMscf/d over
    the interval 462.8m to 467.5m at a stabilized rate of 1.15
    MMscfg/d through a ½ inch choke.

    •
    Another, shallower reservoir section is also present in this
    well and will be available for future production.

    •
    This is the second confirmed commercial flow rate from the
    Edirne discovery wells.

    Following the shut in period additional perforations will be added and
    the well will be flowed again and prepared as a future production well.
    The rig will then move to test the Arpaci 1 well, which was drilled in
    January 2006, before the 3D seismic was available.
    HIGHLIGHTS
    • Strong board and
    management.
    • World class portfolio across
    4 countries.
    • Imminent production from
    Galoc at 3000-4000 bopd
    net to Otto.
    • 6-10 well exploration
    campaign in 2008.
    • Opportunity rich with
    - 8 discoveries
    - 16 prospects
    - Over 60 leads
    in the portfolio.
    The partners in the Edirne Gas project are
    Otto Energy 35% and Joint Operators
    Incremental Petroleum (55%) and Petraco Energy (10%).
    The attached release from Incremental Petroleum provides further information on
    the Kuzey Arpaci-1 well test.
    Yours faithfully

    _________________
    Alex Parks
    Chief Executive Officer
    For further information visit Otto’s website
    www.ottoenergy.com or contact:
    Jill Thomas
    Corporate & Investor Relations Manager
    Otto Energy
    +61 (0) 8 6467 8800
    0439 440 016

    thomas@ottoenergy.com
    [Type text]
    4th June 2008
    Australian Securities Exchange (ASX)
    By ASX online
    Incremental again has excellent gas rates in West Turkey well No.
    2 partial test
    Incremental Petroleum (ASX: IPM) and Otto (ASX: OEL) are pleased to announce
    that the Kuzey Arpaci 1 well has tested at excellent rates from a tested section of
    only 5m in the lower reservoir. Incremental is the joint operator and holds 55%
    interest in the Edirne gas project.
    The interval 462.8 to 467.5m flowed at a stabilized rate of 1.15 mmscfg/d through a
    ½” choke. After the shut in period additional perforations will be added, the well will
    be flowed again and prepared as a future production well. Another, shallower
    reservoir section is also present in this well and will be available for future production.
    The rig will then move to test Arpaci 1, which was drilled in January 2006, before the
    3D seismic was available. The log interpretation on this well is ambiguous, and the
    purpose of the test will be to determine if gas is present. In the event that the test is
    wet, it will have no impact on the JV development plans, where we are rapidly
    moving towards monetizing this significant asset.
    The partners in the Edirne Gas project are Incremental Petroleum 55%, Otto Energy
    35% and Petraco Energy (10%), who are also the joint operator with Incremental.
    Gerard McGann
    Managing Director
    [Type text]
    ORTAKCI
    IKIHOYUK
    ARPACI 2
    KUZEY
    ARPACI
    0 5 km
    3D AREA
    LICENCE
    BOUNDARY
    LOCATION MAP
    ARPACI 1
    Figure 1: Location of four wells in 2008 Edirne drilling campaign
    [Type text]

  4. #4
    Legend shasta's Avatar
    Join Date
    Sep 2004
    Location
    Wellington
    Posts
    5,914

    Default

    Quote Originally Posted by tricha View Post
    And yes oil to flow soon as WELL, then we will see some excitement!



    4 June 2008
    Otto Flows Gas from Second Well - Kuzey Arpaci-1
    Edirne, Western Turkey
    Joint venture partners Otto Energy (ASX: OEL) and Incremental
    Petroleum (ASX: IPM) announce that the Kuzey Arpaci-1 well has
    tested at excellent flow rates from a tested section of only 5m in the
    lower reservoir.
    Highlights

    •
    Kuzey Arpaci-1 flowed dry gas at a rate of 1.15 MMscf/d over
    the interval 462.8m to 467.5m at a stabilized rate of 1.15
    MMscfg/d through a ½ inch choke.
    •


    Another, shallower reservoir section is also present in this
    well and will be available for future production.
    •


    This is the second confirmed commercial flow rate from the
    Edirne discovery wells.
    Following the shut in period additional perforations will be added and
    the well will be flowed again and prepared as a future production well.
    The rig will then move to test the Arpaci 1 well, which was drilled in
    January 2006, before the 3D seismic was available.
    HIGHLIGHTS
    • Strong board and
    management.
    • World class portfolio across
    4 countries.
    • Imminent production from
    Galoc at 3000-4000 bopd
    net to Otto.
    • 6-10 well exploration
    campaign in 2008.
    • Opportunity rich with
    - 8 discoveries
    - 16 prospects
    - Over 60 leads
    in the portfolio.
    The partners in the Edirne Gas project are


    Otto Energy 35% and Joint Operators
    Incremental Petroleum (55%) and Petraco Energy (10%).
    The attached release from Incremental Petroleum provides further information on
    the Kuzey Arpaci-1 well test.
    Yours faithfully
    _________________
    Alex Parks
    Chief Executive Officer
    For further information visit Otto’s website www.ottoenergy.com or contact:
    Jill Thomas
    Corporate & Investor Relations Manager
    Otto Energy
    +61 (0) 8 6467 8800
    0439 440 016
    thomas@ottoenergy.com
    [Type text]
    4th June 2008
    Australian Securities Exchange (ASX)
    By ASX online
    Incremental again has excellent gas rates in West Turkey well No.
    2 partial test
    Incremental Petroleum (ASX: IPM) and Otto (ASX: OEL) are pleased to announce
    that the Kuzey Arpaci 1 well has tested at excellent rates from a tested section of
    only 5m in the lower reservoir. Incremental is the joint operator and holds 55%
    interest in the Edirne gas project.
    The interval 462.8 to 467.5m flowed at a stabilized rate of 1.15 mmscfg/d through a
    ½” choke. After the shut in period additional perforations will be added, the well will
    be flowed again and prepared as a future production well. Another, shallower
    reservoir section is also present in this well and will be available for future production.
    The rig will then move to test Arpaci 1, which was drilled in January 2006, before the
    3D seismic was available. The log interpretation on this well is ambiguous, and the
    purpose of the test will be to determine if gas is present. In the event that the test is
    wet, it will have no impact on the JV development plans, where we are rapidly
    moving towards monetizing this significant asset.
    The partners in the Edirne Gas project are Incremental Petroleum 55%, Otto Energy
    35% and Petraco Energy (10%), who are also the joint operator with Incremental.
    Gerard McGann
    Managing Director
    [Type text]
    ORTAKCI
    IKIHOYUK
    ARPACI 2
    KUZEY
    ARPACI
    0 5 km
    3D AREA
    LICENCE
    BOUNDARY
    LOCATION MAP
    ARPACI 1
    Figure 1: Location of four wells in 2008 Edirne drilling campaign
    [Type text]

  5. #5
    Member ELYOB's Avatar
    Join Date
    Oct 2002
    Location
    Philippines , aussie of Perth
    Posts
    398

    Default

    Euroz report out today becoming more conservative target 12 months 60c .... but indicate lots of possible farmouts of big Palawan plays by Sept quarter which could be very interesting.......looking for $1 longer term . High entry price atm 41c is speculative in their view ......

  6. #6
    Senior Member
    Join Date
    Jul 2007
    Location
    North Shore
    Posts
    1,088

    Default

    Just done a double top pattern too...I should have been more attentive in this case and gotten out at 48. Bah!
    Disclaimer: Do not take my posts seriously. They are only opinions.

    AMR has sold all shares and is pursuing property.

  7. #7
    Legend shasta's Avatar
    Join Date
    Sep 2004
    Location
    Wellington
    Posts
    5,914

    Default

    Quote Originally Posted by AMR View Post
    Just done a double top pattern too...I should have been more attentive in this case and gotten out at 48. Bah!
    I got out at an average of 48c, or 50% profit...

    Am waiting til Galoc is up & producing at intended flow rates before returning.

    Though i wasn't in AED, it stills remains a constant reminder that things do go wrong in the O&G game...

    Doesn't mean OEL won't fly, cos it will & i wouldnt miss the Santa Rosa drilling for anything (though it may be 2009 now?).

  8. #8
    Senior Member
    Join Date
    Jul 2007
    Location
    North Shore
    Posts
    1,088

    Default

    Yes this stock is beginning to test my patience. One mistake OEL, and you'll become VPEO. The mistake being either commissioning delays/problems at Galoc or a close below 40.
    Last edited by AMR; 12-06-2008 at 09:33 PM.
    Disclaimer: Do not take my posts seriously. They are only opinions.

    AMR has sold all shares and is pursuing property.

  9. #9
    Member
    Join Date
    Aug 2004
    Location
    , , .
    Posts
    77

    Default

    Question...at begining of trade there was a buyer at 60 and one at 50.........and a seller at 41.

    Why would someione want to buy at 60......is it top of the buy list gets the seller at 41.....

    If you put a buy order in at 60 and there is a seller at 41......do4es the broker sell at 41 or 60.

    Learning all the time

  10. #10
    Senior Member
    Join Date
    Jul 2007
    Location
    North Shore
    Posts
    1,088

    Default

    Quote Originally Posted by ritchie View Post
    Question...at begining of trade there was a buyer at 60 and one at 50.........and a seller at 41.

    Why would someione want to buy at 60......is it top of the buy list gets the seller at 41.....

    If you put a buy order in at 60 and there is a seller at 41......do4es the broker sell at 41 or 60.

    Learning all the time
    The ASX works out an equilibrium price and that's the opening price...
    Disclaimer: Do not take my posts seriously. They are only opinions.

    AMR has sold all shares and is pursuing property.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •