https://www.nzx.com/announcements/364835
Another half a km drilled, switching over to the 12.25" drill bit. We will use this for another ~1km, when we reach another casing point and then switch to the 8.5" bit. Once that is done we are only ~300m from the Primary Target (though I imagine we would have had some gas indications well before we reach the PT - if any gas exists to be found).
With ~1.3km to go until we hit the Primary Target, it is possible that we could reach it by Christmas Day. Though more likely early in the New Year I think as there are bound the be delays and issues that need resolving the deeper we go.