    Quote Originally Posted by silu View Post
    I love the market's reaction to the news. Up 18.4% at the moment. If I wouldn't already be totally overweight on GNX shares I would have topped up some more today.
    Yip, it will be an interesting few years, funding is a must and once secured things could/will fire. So far, hats off to management, there has been little ramping and controlled emotions regarding market releases. Our pipeline of renewable is growing at a time when the public demand it. Ethically, I was a little concerned about J-powers ownership involvement, but at least the deal has allowed current owners to push the price skywards before financial close and in-turn restricting the % owned.

    It will be interesting how the late comers tomorrow value the news.

  2. #82
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    The next few months will be exciting. The J-Power stake will be a final piece of the puzzle and then we have to find out how big the equity raise will be to fund KS2. I've always believed it to be around the 20-30m mark. Besides one botched up CR management so far haven't made many missteps. It will be interesting to see how they will be managing this one. I've kept some funds aside as I believe it will be a CR with some sweeteners for existing shareholders.

  3. #83
    Member
    Join Date
    Mar 2014
    Posts
    369

    Default

    This recent C/R has very little in it regarding costing and future costing. But I guess that is still to be completed and always changing.

    Have I missed the price of construction for Jemalong?

    Reading between the lines they seem confident to get finance for Jemalong, KPS, (165MW of 270MW KSP2) with 105MW to be decided later.

    To get finance for Jemalong and allow for more working capital. They need more cash in the bank and are asking for another 16.2m from shareholders.

    This will change the total issue to 379,914,392

    379,914,392 x .20 = Mcap 75,982,878
    379,914,392 x .24 = Mcap 91,179,454
    379,914,392 x .27 = Mcap 102,576,885

    Once finance is completed, They need Jpower to invest another 25m for more working capital, loan requirements, ect

    at .20 379,914,392 x 19.99% stake = 94,978,598 (18.9m) new issue = 474,892,990 .20 = Mcap 94,978,598
    at .24 379,914,392 x 19.99% stake = 94,978,595 (22.7m) new issue = 474,892,990 .24 = Mcap 113,974,317
    at .26 379,914,392 x 19.99% stake = 94,978,595 (24.7m) new issue = 474,892,990 .26 = Mcap 123,472,177


    In return shareholders get Revenue of 66m - 78m

    The big question for me is costs,

    Project costs
    Finance costs
    Ongoing costs

  4. #84
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    fwiw The construction contract with UGL to build the 50MW Kidston solar project cost $110m to engineer, procure and construct and also included 5 years of operation and maintenance. There was an investor presentation attached to the latest CR https://stocknessmonster.com/announc...asx-2A1155842/ but it only says that they need 31.7m (they'll use $12.5m in cash) to fund Jemalong incl additional working capital.

    My guess is that they are in negotiations at the moment to complete refinance their debt requirements as Kidston Stage 1 is fully operational, the arrival of J-Power and indicative NAIF funding for the Hydro project. I guess it helps that Genex has experienced bankers on their board.

  5. #85
    Member
    Join Date
    Mar 2014
    Posts
    369

    Default

    Quote Originally Posted by silu View Post
    fwiw The construction contract with UGL to build the 50MW Kidston solar project cost $110m to engineer, procure and construct and also included 5 years of operation and maintenance. There was an investor presentation attached to the latest CR https://stocknessmonster.com/announc...asx-2A1155842/ but it only says that they need 31.7m (they'll use $12.5m in cash) to fund Jemalong incl additional working capital.

    My guess is that they are in negotiations at the moment to complete refinance their debt requirements as Kidston Stage 1 is fully operational, the arrival of J-Power and indicative NAIF funding for the Hydro project. I guess it helps that Genex has experienced bankers on their board.

    Thanks for the 110m information, I started looking through announcements and gave up,

    The wording on these documents is for the banking type, not the working with wood type.

    Agree, the finance side of the operation seems very well managed.

  6. #86
    Member
    Join Date
    May 2014
    Location
    Christchurch
    Posts
    96

    Default

    Quote Originally Posted by Carpenterjoe View Post
    This recent C/R has very little in it regarding costing and future costing. But I guess that is still to be completed and always changing.

    Have I missed the price of construction for Jemalong?

    Reading between the lines they seem confident to get finance for Jemalong, KPS, (165MW of 270MW KSP2) with 105MW to be decided later.

    To get finance for Jemalong and allow for more working capital. They need more cash in the bank and are asking for another 16.2m from shareholders.

    This will change the total issue to 379,914,392

    379,914,392 x .20 = Mcap 75,982,878
    379,914,392 x .24 = Mcap 91,179,454
    379,914,392 x .27 = Mcap 102,576,885

    Once finance is completed, They need Jpower to invest another 25m for more working capital, loan requirements, ect

    at .20 379,914,392 x 19.99% stake = 94,978,598 (18.9m) new issue = 474,892,990 .20 = Mcap 94,978,598
    at .24 379,914,392 x 19.99% stake = 94,978,595 (22.7m) new issue = 474,892,990 .24 = Mcap 113,974,317
    at .26 379,914,392 x 19.99% stake = 94,978,595 (24.7m) new issue = 474,892,990 .26 = Mcap 123,472,177


    In return shareholders get Revenue of 66m - 78m

    The big question for me is costs,

    Project costs
    Finance costs
    Ongoing costs
    Possibly another (final?) cap raise for the pumped hydro as well if J-Power, NAIF and EnergyAustralia’s contributions don’t quite make it.

  7. #87
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    Like the Black Caps last night never in doubt right?

    NAIF Approves $610M Concessional Funding for Kidston Hydro
    https://www.asx.com.au/asxpdf/201907...0cb87byj9z.pdf

  8. #88
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    Today we will find out if the 24c SPP has been scaled back or not. The minimum investment was A$5000 so smaller shareholders may have been left out of here. I've gone for the maximum A$15k (current SP 26.5c) as I don't think they are going back to shareholders for financial close on KH1.

    Simon actually confirmed in the latest interview here https://youtu.be/ZuyjcvFMhrQ that with the NAIF loan of A$615m and the up to A$25m investment by J-Power their share of this project is fully funded. For the first time ever they gave a concrete timeline for financial close on this project which is by 30th September.

    I expect a re-rate of the SP leading up to or following this announcement.

  9. #89
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    The SPP @ 24c was way more popular than I anticipated. They expected to raise $3m but got subscriptions for almost $5.3m. https://www.asx.com.au/asxpdf/201907...6ch638sz2r.pdf

    Opened at 25.5c after shares have been allocated so to those inclined to take a small profit could do so now. I'm in for the long haul but may scale back my very large holding after the expected re-rate after KH1 financial close.

    P.S. Directors have also participated in this SPP for the full $15k
    Last edited by silu; 26-07-2019 at 12:27 PM. Reason: added a P.S.

  10. #90
    Senior Member Dej's Avatar
    Join Date
    Dec 2012
    Posts
    615

    Default

    Quote Originally Posted by silu View Post
    The SPP @ 24c was way more popular than I anticipated. They expected to raise $3m but got subscriptions for almost $5.3m. https://www.asx.com.au/asxpdf/201907...6ch638sz2r.pdf

    Opened at 25.5c after shares have been allocated so to those inclined to take a small profit could do so now. I'm in for the long haul but may scale back my very large holding after the expected re-rate after KH1 financial close.

    P.S. Directors have also participated in this SPP for the full $15k
    Like you, Silu, I have way to much of this in my portfolio.

    Have re positioned a lot of things over the past year, but this is one I have held now since March / April of 2016 and lots of profits from other more speculative investments I push into Genex.

    Very excited about the projects and the company.
    “If you are distressed by anything external, the pain is not due to the thing itself, but to your estimate of it; and this you have the power to revoke at any moment.” ― Marcus Aurelius

  11. #91
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    Quote Originally Posted by Dej View Post
    Like you, Silu, I have way to much of this in my portfolio.

    Have re positioned a lot of things over the past year, but this is one I have held now since March / April of 2016 and lots of profits from other more speculative investments I push into Genex.

    Very excited about the projects and the company.
    Good to hear you're still in it Dej. I believe it was actually you who suggested GNX to me so thank you! Now lets get the financial close for KH1!

  12. #92
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    It's behind a paywall but the Townsville Bulletin reports that the QLD state government approved the A$132m funding for the transmission line for the Kidston Renewable Energy Hub.

    N.B. Actually ABC news reported it as well https://www.abc.net.au/news/2019-09-...tling/11467992
    Last edited by silu; 04-09-2019 at 10:26 AM.

  13. #93
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    Joint statement between Genex and QLD State Government is out https://www.asx.com.au/asxpdf/201909...y6jg6d23z2.pdf

  14. #94
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    While we are still waiting on the official financial close announcements I rest easy knowing Energy Australia is looking for a Project Manager on Seek for the Kidston Pumped Hydro Project https://www.seek.com.au/job/40017209...4-897a230a1473

  15. #95
    Member
    Join Date
    Mar 2014
    Posts
    369

    Default

    Interesting post on HC regarding inverter issues, apparently the solar field has been off line a number of times, I dont believe this has been released to market. Seems UGL are going to earn their margin resolving this issue. Hopefully this is settled quickly and stays away from the courts.

  16. #96
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    bad bad bad
    Last edited by silu; 01-11-2019 at 04:13 PM. Reason: because bad

  17. #97
    Update Ready To Install
    Join Date
    Aug 2010
    Location
    Floating Anchor Shoals
    Posts
    8,885

    Default

    Hopefully it comes through in 2020 for you silu
    Kidston Pumped Storage Hydro - Project Update 2 pages 141.4KB


    1. As part of its final approval processes, which were targeting a final investment decision in CY 2019, EA has today advised Genex that it will not be in a position to reach a positive investment decision on the basis of the long term energy agreement structure as outlined in the Term Sheet. In light of this development, Genex wishes to advise that it no longer anticipates that it will reach financial close on the Project in CY 2019.





  18. #98
    Senior Member
    Join Date
    May 2000
    Location
    , , .
    Posts
    1,443

    Default

    Quote Originally Posted by Joshuatree View Post
    Hopefully it comes through in 2020 for you silu
    Kidston Pumped Storage Hydro - Project Update 2 pages 141.4KB


    1. As part of its final approval processes, which were targeting a final investment decision in CY 2019, EA has today advised Genex that it will not be in a position to reach a positive investment decision on the basis of the long term energy agreement structure as outlined in the Term Sheet. In light of this development, Genex wishes to advise that it no longer anticipates that it will reach financial close on the Project in CY 2019.




    I better hope so. I'm BIG into this coy. I honestly feel quite ill right now.

  19. #99
    Member
    Join Date
    Apr 2017
    Posts
    87

    Default

    How big of an issue is it? Just a delay or chance it gets canned?

  20. #100
    Member
    Join Date
    Mar 2014
    Posts
    369

    Default

    Quote Originally Posted by silu View Post
    bad bad bad
    Thinking chin up silu,


    We have to wait a little longer for Energy Australia, sounds like negotiations broke down. I would love to know the reasons, usually its money. It could be a good sign our little company is negotiating hard. Seems there has been no market leak, share price has been strong recently.

    This project is in high demand, I wouldnt be surprised for the politicians to get involved. They may open their wallets even more.

    Looking to add a few more over the next little while, I see this as a delay, it happens all the time in my industry. Hopefully this is resolved in the first quarter next year and not the last.

    Its a pitty, it was tracking so well.