sharetrader
Page 1 of 9 12345 ... LastLast
Results 1 to 10 of 82
  1. #1
    Member
    Join Date
    Feb 2001
    Location
    , , New Zealand.
    Posts
    79

    Default BLR black range mineral

    Heres another small uranium company to keep an eye on. looks like more upgrades to come in the future.

    TAYLOR RANCH URANIUM PROJECT
    UPDATE

    The Company has previously announced that the Taylor Ranch
    Uranium Project, in Colorado, USA hosts the high-grade
    Northwest Taylor Uranium Deposit (area delineated in white on
    Figure 1 containing an exploration target of 2-3million pounds
    at approximately 0.2% U3O8) and that uranium mineralisation
    had been intersected previously at more than eight other prospects
    within the project area.
    Historic data compiled to date now indicates that at least 550 holes
    have been drilled previously at the project. Drilling confirms that
    the Northwest Taylor Uranium Deposit comprises one part of an
    extensively mineralised system that extends for more than 5
    kilometres of strike (refer Figure 1).
    Previous explorers have outlined the extent of the mineralised
    system by generating “grade x thickness” contours (grade as a
    percentage times thickness in feet or “GT”) based on results from
    previous drilling (refer Figure 1). Using a 0.25 GT cut-off, the
    historic data assessed to date indicates that the Taylor Ranch
    Uranium Project hosts an initial exploration target estimate of
    10-15 million pounds of U3O8.
    The exploration target estimates are presented here as conceptual
    targets that may result from the completion of successful exploration
    and confirmation of previous work. They should not be understood as
    indicating the existence of reserves or resources in the sense implied
    by the JORC Code as it is uncertain if further exploration will result
    in the determination of a Mineral Resource. However they are
    presented because Black Range Minerals wants to inform
    shareholders of the basis for its assessment of the exploration
    potential of the Taylor Ranch Project, based on the data currently
    available to the Company.
    The Company will commence an extensive drilling programme at
    the Taylor Ranch Uranium Project in early March to confirm
    historic results and expects to progressively announce a JORCcompliant
    resource for the project. In this regard, particular efforts
    will be made to assess the four zones within the project area,
    which are outside of the historic grade-thickness contours, and
    hence not included in the updated exploration target noted above,
    but for which close-spaced drilling has been undertaken previously
    (refer Figure 1).
    The Company intends progressively updating the resource to
    JORC-compliant standards as the drilling programme progresses.

  2. #2
    Member
    Join Date
    Sep 2004
    Location
    , , New Zealand.
    Posts
    219

    Default

    hi donnie,been watching this for3 weeks,good to see you started a thread,another ur spec but in the usa and worth a look.any ideas on management?.the share price ran away from my bid and for now in not chasing it up,cheers pago.

  3. #3
    Member
    Join Date
    Sep 2000
    Posts
    337

    Default

    Been watching since around 8c due to all the hype on HC.

    Haven't had a good look, but volumes have been huge of late

    Paddie

  4. #4
    Member
    Join Date
    Feb 2001
    Location
    , , New Zealand.
    Posts
    79

    Default

    BLR just announce their quarterly report, looks like drilling starts in march on the taylor ranch project.

    URANIUM

    The Company acquired a 100% interest in the high-grade
    Taylor Ranch Uranium Project in Colorado, USA.
    Based on historic data, including >550 drill holes, the
    company has an initial exploration target estimate for the
    Taylor Ranch Uranium Project of 10-15 million pounds of
    U3O8.
    Furthermore the Company is actively seeking historic data
    from 4 other areas within its Taylor Ranch Project, where
    considerable close-spaced drilling has been undertaken
    previously, but where to date no results have been located.
    Drilling at the Taylor Ranch Uranium Project is expected to
    commence during March 2007 and JORC-compliant
    resource figures will follow progressively thereafter.
    The Company completed its inaugural drilling programme
    at its Eagle Uranium Project in Wyoming.
    Calculation of a JORC-compliant resource for the Eagle
    Project is in progress.
    Negotiations to acquire several additional advanced uranium
    projects continue.

    BASE METALS
    Compilation of historic data from the high-grade Ferris-
    Haggerty Copper Deposit in Wyoming, USA is progressing
    well.
    Ore grades during historic production averaged 20% copper.
    Remaining unmined ore is estimated to comprise at least
    1Mt at 5-6% copper and 3-4g/t gold.
    No exploration drilling has ever been undertaken.
    Considerable potential remains to delineate further highgrade
    mineralisation.
    Exceptional near-term production opportunity.
    The airborne EM survey over the entire Koonenberry Base
    Metal Project in NSW, to fast-track exploration there, is
    now scheduled for February 2007.


    http://sa.iguana2.com/cache/51ab8553...BLR-349673.pdf


  5. #5
    Member
    Join Date
    Feb 2001
    Location
    , , New Zealand.
    Posts
    79

    Default

    hi pago & paddie

    It's good to see BLR on the move again up to 15c.

    Theres very good volumes going through at the moment as you say paddie lets hope it continues.

    Their management seem alright at the moment, but we'll have to see how they go in the future.

    Currently they have some projects lined up to be announced within the next year also, which should add value to the share price.

    i'd be very dissapointed if the share price didn't hit 27c in the next 3 month, thats my aim to get out.lets hope i succeed[:0].




  6. #6
    Member
    Join Date
    Feb 2001
    Location
    , , New Zealand.
    Posts
    79

    Default

    BLR looks like its going to crash through 20c next week, Its been a good run this week. hope you guys got in.

    currently 18c

  7. #7
    Member
    Join Date
    Sep 2000
    Posts
    337

    Default

    Hi Donnie,

    No, I didn't get on, and the rise in share price has been very impressive to say the least, closing at 19.5c today.

    Good luck

    Paddie[][]


  8. #8
    Member
    Join Date
    Feb 2001
    Location
    , , New Zealand.
    Posts
    79

    Default

    as predicted broke through 20c without a sweat, it's up to 23c at the moment. looks like those traders have gone which is going to be even better for the price.

    __________________________________________________ _______________

    The share price finally hit 27c, the price is going abit crazy today[8D][:I]. i wonder if the asx issues an explain notice in the near future.

  9. #9
    Legend shasta's Avatar
    Join Date
    Sep 2004
    Location
    Wellington
    Posts
    5,914

    Default

    Currently $0.25 up 28% on 71m turnover, surely a please explain notice is due for this speeding ticket!

  10. #10
    Member
    Join Date
    Mar 2006
    Location
    Auckland, New Zealand
    Posts
    482

    Default

    My take on BLR..
    The key to whether BLR become a producer is the Management.
    They are quoted as saying they only purchase projects that can be brought to production in the near term within 2-5 years.

    If they can get a JORC compliant resource by end of 2007 year as stated and get PFS and BFS underway then we are in good company. Also what is very interesting is the close proximity to one of the 4 licenced Processing facilities in the US hey are in discussions with that facility

    Defining the Jorc resource is the next step.

    Taylor ranch could turn out to be a winner but the development strategy is paramount:
    1) JORC compliant resource for Taylor
    2) Extensive drilling over total U tenement to confirm and increase U resource estimates
    3) Testing extensions of all deposits
    4) Utilizing uranium mill in Canon city via discussions
    5) Providing JORC compliance resources throughout 2007
    6) Pre feasibility study inside of 12 months

    these are the goals at this stage so the flow of news to the market must be progressive with a common goal of getting to production in the fastest possible timeframe as the global resource supply /demand ratios for U308 are 100 million lb (supply) verses 200 million ld (demand and increasing) I dont believe supply will catch up with demand for at least a decade as it takes at least 5 years from discovery to production depending on various factors.

    BLR have advanced uranium projects...this is the best way to go IMHO

    CHEERS
    \"if women didn,t exist , all the money in the world would mean nothing\" Aristotle Anasis.

    \"The trend is your friend\"

    \"A mans reach should always extend beyond his grasp" J.F Kennedy

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •