Firstly I think the notification date is 31st of July and it has to be a positive notification, i.e. if they say nothing it drops of . I do not think anyone else can supply at the prices Tiwai want and make aprofit. A domestic customer in NZ pays 26-28c/Kwhr, an industrial about 8- 10 c/Kwhr and tiwai about 3c/Kwhr.after paying for the very high transmission security they have.